Two scratch built fire extinguishers 20mm high machined from 6mm diameter red plastic
Saturday, 23 February 2013
Basic control electrics fitted to grey lift out board for easy access.
The ballast/bath test revealed signs of water entering the hull via the propshafts, so these I have removed and will upgraded with Nitrile 70 'O'ring seals at either end.
Wednesday, 20 February 2013
Preliminary lead ballast added, this babies gonna be heavy!
Monday, 18 February 2013
....a little more progress. Stainless steel bollards, lifebelt and lights fitted