Radar working, Mast and Lifebouys all finished. Funnels, railings, exterior lighting and cabin interior still to finish
Tuesday, 21 May 2013
Norwegen colours
Monday, 20 May 2013
LED Mast Navigation Lights, with the electrical connection made via magnets
Sunday, 19 May 2013
Trigg as crane driver
Wednesday, 15 May 2013
Wiring the mast
Sunday, 12 May 2013
Liferaft Decals from Modellbau-Kaufhaus
Saturday, 11 May 2013
Liferaft and Radar
Tuesday, 7 May 2013
The radars are geared together and will revolve via a miniture motor located under the Bridge
Monday, 6 May 2013
Probably the most difficult part of the whole build is now completed, cutting the window apertures on both the outer and inner skins in order coloured acetate can be slipped in between for the tinted windows, phew!