Sunday, 26 May 2013

Radar working, Mast and Lifebouys all finished. Funnels, railings, exterior lighting and cabin interior still to finish

 

Monday, 20 May 2013

LED Mast Navigation Lights, with the electrical connection made via magnets

 

Sunday, 12 May 2013

Tuesday, 7 May 2013

The radars are geared together and will revolve via a miniture motor located under the Bridge

 

Monday, 6 May 2013

Probably the most difficult part of the whole build is now completed, cutting the window apertures on both the outer and inner skins in order coloured acetate can be slipped in between for the tinted windows, phew!