Slipway Dutch Courage RC Tug Project

Sunday, 19 May 2013

Trigg as crane driver


Posted by Hans Bromwich at 08:02
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Slipway Dutch Courage 1/32

  • ►  2012 (28)
    • ►  September (10)
    • ►  October (4)
    • ►  November (8)
    • ►  December (6)
  • ▼  2013 (66)
    • ►  January (21)
    • ►  February (5)
    • ►  March (7)
    • ►  April (10)
    • ▼  May (11)
      • Bridge progress
      • Probably the most difficult part of the whole bui...
      • The radars are geared together and will revolve v...
      • Liferaft and Radar  
      • Liferaft Decals from Modellbau-Kaufhaus  
      • Wiring the mast  
      • Trigg as crane driver
      • LED Mast Navigation Lights, with the electrical c...
      • Norwegen colours
      • Radar working, Mast and Lifebouys all finished. F...
      • Funnels will slot into place
    • ►  June (7)
    • ►  July (4)
    • ►  August (1)

About Me

My photo
Hans Bromwich
View my complete profile
Powered by Blogger.